6 Li + 74 Ge, Elab =28 MeV M.D.L. Barbosa, T. Borello-Lewin, L.B. Horodynski-Matsushigue, J.L.M. Duarte, C.L. Rodrigues, M.R.D. Rodrigues, G.M. Ukita,Physical Review, C71 (2005) 024303 (access to the source may be restricted by owner!)
CommentsBeam quality: no data Target: The self-supported, clean targets, with thicknesses of about 30 mcg/cm2 (70,72 Ge) and 60 mcg/cm2 (74 Ge). Data obtained: author graph (digitized with GSYS 2.4 ) Experminet was performed at the Sao Paulo Pelletron accelerator. Maximum scale uncertainties of ±7% for 70,72 Ge and of ±10% for 74 Ge.
Θcm (deg) σ/σR (ratio) error (%) +δσ -δσ 15.7 0.9413 5.256 0.04947 0.04947 17.9 1.048 5.873 0.06154 0.06154 18.9 0.9954 5.434 0.05409 0.05409 20 1.082 5.437 0.05882 0.05882 21.6 1.098 5.433 0.05965 0.05965 24.3 1.118 5.436 0.06077 0.06077 24.8 1.177 4.994 0.05877 0.05877 25.4 1.072 4.995 0.05354 0.05354 26.5 1.057 5.438 0.05747 0.05747 27.7 0.9724 5.257 0.05111 0.05111 28.1 0.9282 4.994 0.04635 0.04635 28.4 0.9239 4.767 0.04404 0.04404 29.2 0.886 5.435 0.04815 0.04815 29.7 0.9545 5.874 0.05606 0.05606 30.2 0.8737 5.874 0.05132 0.05132 31.3 0.7923 5.435 0.04306 0.04306 32.3 0.7741 5.435 0.04207 0.04207 33.4 0.702 5.255 0.03689 0.03689 34.5 0.6669 4.994 0.0333 0.0333 35.6 0.6248 4.994 0.0312 0.0312 36.6 0.6336 5.747 0.03641 0.03641 38.8 0.5138 5.874 0.03018 0.03018 40.9 0.4552 4.994 0.02273 0.02273 43 0.3709 5.255 0.01949 0.01949 45.2 0.3137 5.436 0.01705 0.01705 47.3 0.2544 5.256 0.01337 0.01337 49.4 0.2181 5.255 0.01146 0.01146 53.6 0.151 5.435 0.008206 0.008206 57.8 0.09747 5.874 0.005725 0.005725